Supplemental - Appendix C - Infrastructure Schedule

  1. The earliest dates for the railway stations at Park Barn and Merrow are not expected before 2024 (six years later than first anticipated).
  2. Two road safety schemes for the A3 have been abandoned.
  3. SCC appear to have washed their hands of involvement in the delivery of a number of highway developments on the local road network (which is their responsibility).(E.g. those in LRN7).
  4. LRN7 (For Wisley Airfield) is an example of inadequate infrastructure requirements to address the problems that would be created by a strategic site.