Supplemental - Appendix C - Infrastructure Schedule
- The earliest dates for the railway stations at Park Barn and Merrow are not expected before 2024 (six years later than first anticipated).
- Two road safety schemes for the A3 have been abandoned.
- SCC appear to have washed their hands of involvement in the delivery of a number of highway developments on the local road network (which is their responsibility).(E.g. those in LRN7).
- LRN7 (For Wisley Airfield) is an example of inadequate infrastructure requirements to address the problems that would be created by a strategic site.